The Presto PPS2200-62NFO-27 Fork Over Pallet Stacker is a full featured, powered drive / powered lift pallet stacker with a fork service range of 3-1/2" to 62". This Presto pallet stacker feature a fixed fork over fixed leg design for lifting and positioning open bottom skids and pallets. Ergonomic handle features comfort grip controls with finger tip switch redundancy for right or left hand operation. An Auto-reverse belly switch increases operator safety when working in tight environments. Travel Speed is 2.8 m.p.h. loaded and 3.4 m.p.h. unloaded. Turtle mode feature reduces operating speed by half for precise load positioning. A thin mast and offset design minimizes operator blind spots. Comes standard with 12V 75ah AGM batteries, battery charge indicator, and integral 115v battery charger. This Presto fork over stacker is light-weight and quiet making it perfect for use on loading docks, in warehouses, and on shop floors.
For use with open bottom pallets and skids only. Not for use with regular pallets. Not For Use With Loads Greater Than 48" In Depth.
Presto Pallet Stacker PPS2200-62NFO-27 has an estimated lead time to leave the warehouse of 5 business days.
Specifications:
- Fixed Fork & Leg Width: 27" O.D.
- Capacity: 2,200 LBS at 24" load center
- Individual forks size: 42"L x 6"W x 2" Thick (24" load center)
- Ground clearance: ¾" | NOT RECOMMENDED FOR USE ON GRADE
- Travel Speed: 2.8 mph loaded / 3.4 mph unloaded
- Turtle speed feature reduces drive speed by 50% for precise load positioning or when working in tight spaces
- 24 volt DC, 700 watt drive motor
- (2) 12V 75ah AGM batteries, 115V on-board charger & battery charge indicator
- Lift Speed Feet Per Minute: 17 loaded / 24 unloaded
- Turning Radius: 54" (the recommended aisle width is 8' or more)
- Ergonomic handle features "belly" switch & redundant finger tip controls
- E-Stop emergency stop switch & safety key switch
- 10" x 3" Polyurethane drive wheel and polyurethane load wheels
- Overall Size: 32"W x 67"L x 78"H
- Warranty: 1 year on welded structural frame. All other parts are 90 days parts and 30 days labor.